Wednesday, 4 February 2015

Planning: Costume Pack

We will be using these (or similar) costumes:

 (Geek)





Popular Characters

Planning: Location Pack

We will be filming in City and Islington College:


Specifically, in these locations:






Planning: Sound Design

Here are the sounds we have selected which may be featured in our film:

http://ccmixter.org/content/unreal_dm/unreal_dm_-_Love_Is.mp3

http://ccmixter.org/content/Keytronic/Keytronic_-_Winding_Into_Gone_%28with_Jazz%29.mp3

http://ccmixter.org/content/snowflake/snowflake_-_Holiday_Funky_Blues.mp3

https://onedrive.live.com/?cid=33CAB76975C1073C&authkey=!AIIaI14n3Mfjmrg
(Created by Dan using Logic Pro 9)

Monday, 2 February 2015

MY PROGESS

24 posts
You have worked really hard to catch up with a good amount of individual work as well as group. Continue like this and you will see your marks increase.
- Be more creative with the blog design and ICT use
- GIFs will bring your still images to life without having to create videos
-Group posts should reflect the work of 4 people, some posts lack sufficient detail
- Slideshows should be used for lots of photos

Story board / feel of the film tite

 The overall film title included a Geeky character as well as a popular character, 

The idea of the story was to show how a 'geeky character acts in a school environment in comparison to how a 'popular person' acts.
The twist to the title is that whilst having two separate shots of both types of people and their personal missions for that day , they meet suddenly and it reveals a strange connection between the two characters, The popular girls friend then looks at her in disgust as how she was nice to a geek.



We named the film strange connection as its two considered opposites who strangle attract each other.

The whole film will reveal what happens when this connection carries on.

Pictures Whilst filming

Film Day

Today We started filming my shots first, it went really well and we had a free maths classroom to get the 'geeky' feel. We only had to go through the the shots a couple times.

Also we had to film  me walking down the whole length of the corridor so we had to do many takes to get a natural tracking shot feel. However we learnt that people are doing lessons and tend to wonder between classes so we we had to be ready to re do shots at all times.



For the long shot of me walking down the stairs I had to be on the second floor whilst it was filmed by dan outside of the college, it was cool as he had to text when action was.
For the final scene we had to film me and Monica meeting in the cafeteria, this scene was quick and easy to film.







If i could change one thing about this project it would be for me to film more scenes.